Scenario
Pilot to Production: New product with limited production capacity and manufacturing data. Project required extensive amount of technical coverage.
Goal
Successfully scale up product manufacturing and optimize process efficiency.
Methodology
Provide good technical scale-up and guidance to validate several optimum process assumptions and bring product to market successfully and on time.
- Developed project parameters to successfully scale up new process.
- Provided around the clock technical coverage both in the plant and in the lab.
- Consolidated a multi-step process in one vessel to further increase efficiency and reduce costs output.
Polymerization, Solvent Exchange, and Drying
The Ascent Chemicals Staff:
- Reduced full process from 6 vessels to 2 vessels – one reaction vessel required for synthesis and one intermediate tank.
- Achieved 300% greater throughput efficiency to meet substantial product launch volumes.
- Ascent Chemicals sourced specialty materials to scale up to aid in project timeline.